Wednesday 11/26 Update

Temporary construction fence has been installed within the courtyard and across the playground. Openings have been left for access and passage around through the weekend, but these will be closed Monday morning at 8 AM as soil excavation begins.

Exit into the courtyard from units ABC, DE, FG and H will be blocked during working hours (8:30 to 5 M-F) until this work is complete. The gated entrances into the courtyard next to unit A, and from the streetside between C and D and between E and F will also be locked during the working hours as well.

Bike racks, the storage shed, and all strollers outside of these entryways will be moved to the side of the high rise before the work starts. Access to the courtyard side of the highrise will be available, but you'll have to go around during construction hours.

Parking spaces on Audrey Street and Amherst Alley have been set aside for container storage and truck access. These will need to remain clear during the construction as containers and trucks will be moving through as they are loaded.

The courtyard closure should only take a week or a week and a half, depending on how deep we have to go. I'll keep updates posted as we get into it next week.

Thanks and have a great Thanksgiving holiday.

Richard

Tuesday, November 25, 2008

Tuesday 11/25 Update

The soil excavation program is scheduled to start on Monday, 12/1.  Crews will be on site tomorrow, Wednesday, to begin mobilization of equipment, installing fence, and securing access for equipment.  Our plans are to complete the courtyard first and then move to the streetside.

We've discussed taking a large area of the courtyard as the large equipment is dangerous and difficult for operators to see on all sides.  This taking will only be during the working day and we will open the fences in the evening and weekends to allow access.

We've also posted signage designating two spaces on Audrey Street and four spaces at the entrance to Amherst Alley (between units F and H) for clearance to deliver and remove roll-off containers being used to transport soils.

Building cleaning will continue for a few more days, but this work is almost complete as well.

Thanks.

Richard

 

Tuesday, November 18, 2008

Tuesday 11/18

Crews are cleaning overspray and paint chips from streetside ABC today. They plan on moving to streetside DE after, but probably not until tomorrow. They are using hand grinders and wire brushes and this noise shouldn't be significant, though a few streetside entrances may be closed while they use lifts and work near doors.

Fencing has been removed from the courtyard. A few have asked about balconies. We are done cleaning them for now, but may be accessing to clean overpsray. It's ok to place belongings on the balcony, but we may have to move things around to clean.

Thanks.

Richard

Friday, November 14, 2008

Friday 11/14 Update

Crews have completed all balcony cleaning and concrete sampling as of 2:15 PM today. An informal walkthrough identified a number of overpray and paint issues that were not completed today and will still need to be done. This work is not loud, but obviously is an intrusion.

This was supposed to have been completed by today, but they missed. The work is planned for next week and as soon as I have a schedule with specific buildings I'll post an update.

A few have written to ask about wood and other materials on balconies. Any wood or construction debris that is left on your balcony will be removed as this work finalizes.

All entrances on both sides of all units will be open through the weekend and until continued cleanup activities start.

Thanks and have a great weekend.

Richard

Thursday, November 13, 2008

11/13 11:15 AM Update

Engineers are going to collect samples on streetside balconies H1, J1, J3, and J4 first today. Once done we will be done with building HJK.

Thursday 11/13 Update

Just heard from engineers and the list of balconies requiring concrete sampling was incomplete. The following are the remaining balconies that need to be sampled:

Courtyard A5, B6, E1, and F5. Streetside B1, B4, B5, B6, C6, E1, E2, E4, E5, F5, G4, G6, H1, J1, J3, and J4. Twenty in total.

Their plan is to be on site this morning at 11 and begin with the ground level (both E1's, B1, H1, and J1 balconies), and then progress to the second and third floor units as the lifts become available.

They are still planning on completing all drilling by tomorrow afternoon. As I get more details I'll forward.

Richard

Wednesday, November 12, 2008

Wednesday 11/12 Update

Crews are almost done with the CAPSUR work and expect to complete by end of the day tomorrow. Overspray and paint cleanup continues and we hope to have final inspection and signoff by the end of the week on all Westgate buildings.

The post-CAPSUR sampling that has been so noisy is amost done as well. Engineers are planning on returning on Thursday (11/13) to begin final collection. They will need to collect samples from streetside C6, D5, E2, E4, F5, G6, J3, and J4, as well as from courtyard balconies A5, D6, E1, and F5.

I don't have the order of sampling but expect them to move from building to building in a manner that makes best use of the lift. At a minimum, expect the noise to be loud for 10 minutes or so per balcony. If/when I get their detailed approach I'll post an update.

This work should complete by end of the day Friday.

After that, we have the soil excavation program and this will start as soon as final work plan documents are approved and signed - expecting this to begin sometime towards the middle of next week.

We'll be at tonight's meeting and available to discuss in greater detail there. Thanks as always.

Richard